Job Details: The existing road surface was in poor condition due to constant use and the potholes made it unsuitable for use and required replacing. The existing tarmac was plained to a desired depth and prepared with tackcoat before the new surface course was applied. All new joints were sealed and site was handed back to a very satisfied customer.

Duration: 2 Days. Completed: September 2013.